alt logo
Call Us On
03 579 4774

Terms of Trade

Construction Coatings Limited

Terms and Conditions


The following conditions, unless specifically excluded, form part of this quotation and should be noted before deciding to proceed with the proposed work.
 
1. Scaffolding:  
Suitable safe scaffolding and planks are the responsibility of the owner or the main contractor.  All scaffolding has to be clear of the exterior wall by at least 200mm.

2. Site Provisions:
Clean, dry storage will be needed for materials, and we will require the full time use of a single phase power outlet and a water tap.
 
3. Payment:
Contracts are normally based on progressive payments unless special circumstances require an alternative and are bound by the Construction Contracts Act.
 
  • First payment is calculated on the percentage of work completed at the end of the current billing period.  Payment to be made no more than 20 days following invoice.
  • Final payment is to be made at the completion of the contract.  Payment to be made no more than 20 days following invoice. 
  • No retentions are to be held on this contract unless prior agreement has been made between the contracting parties before work commences.
  • In the event of unreasonable delay in the payment of contract and variation moneys, interest will accrue on all overdue amounts including accrued interest at 1.25 times the published bank overdraft rate. OVERDUE accounts exceeding 90 days may be referred for collection and all costs incurred including solicitor / client costs will be added to the amount payable to satisfy the debt. 

6. Commencement of work:
Please sign and return the acceptance copy as soon as possible so your work can be programmed into our current work load.  Until we receive your acceptance, we must assume that you have either delayed the project or intend to use another system or contractor. Please ensure that you notify to us the start/completion dates and any liquidated damages that may apply prior to accepting our  price.
 
7. Insurance:
All risk contractors insurance cover will be the responsibility of the main contractor or the owner. We will not be liable for any accidental damage that could normally be covered by such a policy.
 
8. Warranty:
Only the best of materials are supplied and used.  We will therefore stand by the quality of the material and services that we provide.  However, we cannot accept any responsibility for damage or defects caused by timber or background shrinkage or movement, nor any other cause beyond our control. A warranty will only be issued when payment has been made in full.
 
9. Quotation: 
Quotations are based on current material costs and awards.  Should there be any increases, they will be notified in writing as soon as possible, but in all cases prior to the commencement of any work.  Any variation from the plan or specification or from measurements taken on site will be charged for on the basis of this quotation and will be shown as an extra in the invoice.  All work is contingent upon strikes, lockouts or any other causes which are beyond our control.

 
If you have any questions or wish to vary the contract in any way, please do not hesitate to telephone.  Our business depends on your being satisfied with our service.

Our Services

 
  • Painting Services
  • Specialist Coatings
  • Waterproof Membranes
 

Quick Links

 
 

Contact Us

 
Phone:   03 579 4774
Fax:         03 577 5959
Construction Coatings Limited
Burleigh Industrial Estate
New Renwick Road
Blenheim 7201
 
P O Box 616
Blenheim 7240