BRIEF:
Tank the Wither Hills Vineyard cellar and roof gardens to ensure waterproofing below ground. A huge area of cellar and walls almost two storey’s high were to be buried under 6,000m³ of backfill soil. Approximately 800m² of the cellar and 1,000m² of the 1st floor was to be tanked.
MATERIALS:
As there were two parts to the tanking process requiring two different methods of application, two types of material were chosen for the tanking. Both materials have a long history within the industry and are proven. The two products are quite different requiring quite different applications.
RESULT:
In 2006 the Wither Hills project beat four other contending finalists to win the national 2006 Gold Registered Master Builders award for a Commercial and business project. Construction Coating’s tanking has made a successful contribution to this top national accolade.
ISSUES:
This was a very straight forward job but the size of the job was the main issue given the volume of materials required.